Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

20/02/1897

The year in which a vessel’s construction is completed.

Year of ship completion

1884

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

J McArthur & Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Paisley

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

5413

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Glasgow 14575

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

19/02/1897

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

J Leill

Location where the document is written.

Location of Document Creation

Aberdeen

Location where a vessel’s survey was undertaken.

Location of Survey

Aberdeen

Date of the meeting of the Classing Committee.

Date of Classing committee

23/02/1897

The name of the port/place of destination given.

Destined voyage

Coasting

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

238

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Rossgull

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

18/10/1884

Unique identifier for a given ship, it is assigned by a builder.

Yard no

29

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Abn

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines and Boilers

The listed port to which a given vessel belongs.

Port belonging to

Londonderry

The date of first visit by a surveyor.

Date of first survey

12/02/1897

The individual and/or organisation listed

Ship owner

C J Stewart

Name of the individual/entity/organisation responsible for authoring the record

Document author

Maurice Ritson

Name of surveyor.

Surveyor

Maurice Ritson

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

100A1 7.96; +LMC 1.96

Recorded information related to a vessel’s movements.

Voyage information

Aberdeen; Coasting

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Glasgow

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.