Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/10/1949
The year in which a vessel’s construction is completed.
1943
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Leatham D Smith Shipbuilders Co Ltd
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gms
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Steam Reciprocating Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
Name of the individual/entity/organisation responsible for authoring the record
G C Vaux
Location where a vessel’s survey was undertaken.
Immingham
Date of the meeting of the Classing Committee.
30/12/1949
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Steam Reciprocating Single Acting in Tandem
Date in which construction of a vessel’s engines were completed.
1943
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
William Homan
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1943
The port or place in which the vessel’s construction took place, at the time of writing.
Sturgeon Bay, Wisconsin
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
23932
The listed port to which a given vessel belongs.
London
The individual and/or organisation listed
Ministry of Transport
Location where the document is written.
Grimsby
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Minute on FE Rpt
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1793
Location of construction for a vessel’s engines.
Corry Pa
Ajax Uniflow
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Also refers to Vessels Freeman Hatch & Labon Howes
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.