Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
13/02/1920
The year in which a vessel’s construction is completed.
1924
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Warrens, New Holland Shipyard Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
New Holland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
10599
Other/additional record(s) specifically mentioned, referenced or associated to another record.
London 88621
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
11/02/1920
Name of the individual/entity/organisation responsible for authoring the record
William Morrison; A E Farminer
Name of surveyor.
William Morrison
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Not for Classing Committee
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Great Yarmouth
Crabtree & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Margaret Birch
The process of transferring a vessel to water, but not necessarily her completion.
17/07/1924
Unique identifier for a given ship, it is assigned by a builder.
158
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
The listed port to which a given vessel belongs.
Holland
The date of first visit by a surveyor.
19/06/1919
The individual and/or organisation listed
W I Warren
Location where the document is written.
Middlesbrough
Location where a vessel’s survey was undertaken.
Stockton on Tees
Date of the meeting of the Classing Committee.
13/02/0000
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Date in which construction of a vessel’s engines were completed.
1925
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.