Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

__/__/0000

The year in which a vessel’s construction is completed.

Year of ship completion

1959

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Wartsila-Koncernen A B Sandvikens Skeppsdocka

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Helsinki

The port in which a vessel is registered or permanently based.

Port of registry

Murmansk

The individual and/or organisation listed

Ship owner

U S S R

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

ated

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Moskva

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/01/1959

Unique identifier for a given ship, it is assigned by a builder.

Yard no

365

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Postponed Surveys

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Motor Vessel

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

9427

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

0000

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.