Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
06/06/1952
The year in which a vessel’s construction is completed.
1952
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Kockums Mek Verkstads A B
The port or place in which the vessel’s construction took place, at the time of writing.
Malmo
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3104
The listed port to which a given vessel belongs.
Stockholm
The date of first visit by a surveyor.
29/11/1951
The individual and/or organisation listed
Rederi A/B Soya
Location where the document is written.
Malmo
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See FE Mchy Rpt
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
11
Location of construction for a vessel’s engines.
Malmo
Kockums Mekaniska Verkstads Aktiebolag
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1952
Pertinent, useful or interesting recorded content.
Also refers to Vessel Avance
Name of ship as recorded on the record
Soya-Margareta
The process of transferring a vessel to water, but not necessarily her completion.
12/03/1952
Unique identifier for a given ship, it is assigned by a builder.
343
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mmo
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c Report on Oil Engine Electric Generator Sets
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
30/05/1952
Name of the individual/entity/organisation responsible for authoring the record
A Ozols
Location where a vessel’s survey was undertaken.
Malmo
Date of the meeting of the Classing Committee.
08/07/1952
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Heavy Oil Kockum MAN G5V42
Date in which construction of a vessel’s engines were completed.
1952
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1952
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.