Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

20/03/1950

The year in which a vessel’s construction is completed.

Year of ship completion

1945

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Short Bros Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

24076

The port in which a vessel is registered or permanently based.

Port of registry

Sunderland

The date of first visit by a surveyor.

Date of first survey

29/12/1949

The individual and/or organisation listed

Ship owner

Dover Hill Shipping Co Ltd

Name of the individual/entity/organisation responsible for authoring the record

Document author

A F Sinclair

Location where a vessel’s survey was undertaken.

Location of Survey

Greenock

Date of the meeting of the Classing Committee.

Date of Classing committee

29/03/1950

The name of the port/place of destination given.

Destined voyage

Liverpool

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Newcastle

Engine builder as written

North Eastern Marine Engineering Co (1938) Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1950

Name of ship as recorded on the record

Ship name

Dover Hill

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

12/02/1945

Unique identifier for a given ship, it is assigned by a builder.

Yard no

484

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Grk

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

08/03/1950

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Counties Ship Management Co Ltd

Location where the document is written.

Location of Document Creation

Greenock

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Deferred for Comp LMC

Recorded information related to a vessel’s movements.

Voyage information

Greenock; Liverpool

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7290

Date in which construction of a vessel’s engines were completed.

Year of engine build

1945

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1950

Physical extent of a record.

Number of parts

2

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.