Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
26/04/1937
The year in which a vessel’s construction is completed.
1938
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Furness Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Haverton Hill On Tees
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Furness Ship Building Co Ltd
Broad categories and subdivisions of vessels related to their purpose or function.
Twin Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4085
North Eastern Marine Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Physical extent of a record.
1
Name of ship as recorded on the record
Tasajera
The process of transferring a vessel to water, but not necessarily her completion.
03/03/1938
Unique identifier for a given ship, it is assigned by a builder.
285
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Request for Special Survey
The individual and/or organisation listed
Anglo American Oil Co Ltd
Location where the document is written.
Middlesbrough
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Wallsend
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1937
1937
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.