Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
04/02/1962
The year in which a vessel’s construction is completed.
1962
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Richard Dunston Ltd
Unique identifier for a given ship, it is assigned by a builder.
781
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mch
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4b First Entry Report on Internal Combustion Machi
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
12/12/1961
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Henry Scarr Ltd
Location where the document is written.
Manchester
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Hul 67905
Broad categories and subdivisions of vessels related to their purpose or function.
Hopper Barge
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
KLSSDM6 Heavy Oil
Date in which construction of a vessel’s engines were completed.
1961
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1962
Physical extent of a record.
2
Name of ship as recorded on the record
Theo H Swanton
The process of transferring a vessel to water, but not necessarily her completion.
22/03/1962
Name of the shipbuilder as it appears on the record.
Mirrlees National
The port or place in which the vessel’s construction took place, at the time of writing.
Hessle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
622
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Hull 67905
The date of first visit by a surveyor.
24/11/1961
The individual and/or organisation listed
Melbourne Harbor Trust Commissioners
Name of the individual/entity/organisation responsible for authoring the record
James C Murray
Location where a vessel’s survey was undertaken.
Manchester
Date of the meeting of the Classing Committee.
13/08/1962
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Hazel Grove
Mirrlees Bickerton & Day Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1962
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.