Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
02/04/1965
The year in which a vessel’s construction is completed.
1960
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Schlieker Werft
The port or place in which the vessel’s construction took place, at the time of writing.
Hamburg
The port in which a vessel is registered or permanently based.
Melbourne
The individual and/or organisation listed
Mobil Shipping Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
R B N; A C G
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Oil Tanker
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1965
Physical extent of a record.
1
Name of ship as recorded on the record
Australian Progress
The process of transferring a vessel to water, but not necessarily her completion.
09/01/1960
Unique identifier for a given ship, it is assigned by a builder.
525
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Certificate of Class
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Associated Steamships Pty Ltd
Location where the document is written.
London
Broad categories and subdivisions of vessels related to their purpose or function.
Tanker
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
10186
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1965
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.