Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
11/02/1957
The year in which a vessel’s construction is completed.
1954
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cantieri Navali di Taranto
The port or place in which the vessel’s construction took place, at the time of writing.
Taranto
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
57-AC30205-580
Additional numbers that feature on a given record that may be used for identification.
580 A B
The date of first visit by a surveyor.
05/05/1956
Name of the individual/entity/organisation responsible for authoring the record
N F Pittaluga
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1957
Physical extent of a record.
1
Name of ship as recorded on the record
Agostino Fassio
The process of transferring a vessel to water, but not necessarily her completion.
12/12/1953
Unique identifier for a given ship, it is assigned by a builder.
143
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Anc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
American Bureau of Shipping Report on Castings or Forgings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
02/11/1957
Location where the document is written.
Ancona
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1957
Pertinent, useful or interesting recorded content.
Title of Document has been Altered; Document is by the American Bureau of Shipping
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.