Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1953
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Lithgows Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
10026
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
H K Taylor; T D Scott
Location where a vessel’s survey was undertaken.
Lincoln
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
4VCBZ Engines Nos 332501-2
Date in which construction of a vessel’s engines were completed.
1952
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
ated
Physical extent of a record.
1
Name of ship as recorded on the record
Tuareg
The process of transferring a vessel to water, but not necessarily her completion.
20/11/1952
Unique identifier for a given ship, it is assigned by a builder.
1069
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Not
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c Report on Oil Engine Electric Generator Sets
The individual and/or organisation listed
Wilhelm Wilhelmsen
Location where the document is written.
Nottingham
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
11480
Location of construction for a vessel’s engines.
Lincoln
Ruston & Hornsby Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
0000
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.