Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

26/01/1944

The year in which a vessel’s construction is completed.

Year of ship completion

1944

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Burrard (Vancouver) Dry Dock Co Ltd

Unique identifier for a given ship, it is assigned by a builder.

Yard no

197

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Signal letter/Call sign

VGGQ

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

6091

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Vancouver 5950; Hull 6046; Vancouver 6046

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

25/01/1944

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Park Steam Ship Co Ltd

Location where the document is written.

Location of Document Creation

Vancouver B C

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 with Freeboard; Fitted for Oil Fuel 1,44; FP above 150 F; LMC Asterisks 1,44; FD; CL; 2 WTB 250Ibs (Spt 230 Ib)

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Steamer

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7168

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1944

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Vessel launched under name of Fort Simcoe; Title of Document has been Altered; Also refers to Vessel Fort Yukon; Beaton Park

Name of ship as recorded on the record

Ship name

Lagos Michigan

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/11/1943

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

C W Allan

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Vancouver, North Vancouver, British Columbia

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Vcr

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

1 Steel Steamer or Motorship

The port in which a vessel is registered or permanently based.

Port of registry

Montreal

The date of first visit by a surveyor.

Date of first survey

31/08/1943

The individual and/or organisation listed

Ship owner

Minister of Munitions & Supply of Canada

Name of the individual/entity/organisation responsible for authoring the record

Document author

H Berry; G Sinclair

Location where a vessel’s survey was undertaken.

Location of Survey

North Vancouver B C

Date of the meeting of the Classing Committee.

Date of Classing committee

14/04/1944

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1944

Physical extent of a record.

Number of parts

2

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.