Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

28/10/1954

The year in which a vessel’s construction is completed.

Year of ship completion

1926

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

J Meyer's Scheepsbouw Maatschappij

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Zaltbommel

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

22629

The port in which a vessel is registered or permanently based.

Port of registry

London

The date of first visit by a surveyor.

Date of first survey

15/10/1954

The individual and/or organisation listed

Ship owner

Foremost Dredging Co Ltd

Location where the document is written.

Location of Document Creation

Southampton

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

BS 10,54

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Tug

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

143

Date in which construction of a vessel’s engines were completed.

Year of engine build

1926

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1954

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Hauler

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

07/05/1926

Unique identifier for a given ship, it is assigned by a builder.

Yard no

500

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Sou

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

25/10/1954

Name of the individual/entity/organisation responsible for authoring the record

Document author

E D Cook

Location where a vessel’s survey was undertaken.

Location of Survey

Southampton

Date of the meeting of the Classing Committee.

Date of Classing committee

18/11/1954

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Newbury

Engine builder as written

Plenty & Son Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1954

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.