Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
14/08/1961
The year in which a vessel’s construction is completed.
1930
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Canadian Vickers Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Montreal
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
14187
The port in which a vessel is registered or permanently based.
Montreal
The date of first visit by a surveyor.
23/03/1961
The individual and/or organisation listed
Beaconsfield Steam Ships Ltd
Location where the document is written.
Montreal
Location where a vessel’s survey was undertaken.
Sorel
Date of the meeting of the Classing Committee.
18/09/1961
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Oil Engines 2 S A Each 5 Cylinders
Atlas Diesel
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1961
Name of ship as recorded on the record
Redfern
The process of transferring a vessel to water, but not necessarily her completion.
29/04/1930
Unique identifier for a given ship, it is assigned by a builder.
113
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mtl
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Periodical Surveys & Repairs of Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
11/04/1961
Name of the individual/entity/organisation responsible for authoring the record
William Heatlie
Name of surveyor.
William Heatlie
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
DBS 4,61
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1856
Date in which construction of a vessel’s engines were completed.
1930
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1961
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.