Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

23/08/1953

The year in which a vessel’s construction is completed.

Year of ship completion

1938

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cantieri Riuniti dell'Adriatico

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Trieste

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

L.An

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

1 Steel Steamer or Motorship

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

08/06/1953

Name of the individual/entity/organisation responsible for authoring the record

Document author

W J Bloomfield

Location where a vessel’s survey was undertaken.

Location of Survey

San Pedro

Date of the meeting of the Classing Committee.

Date of Classing committee

10/11/1953

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1953

Draft

1953

Name of ship as recorded on the record

Ship name

Poza Rica

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1938

Unique identifier for a given ship, it is assigned by a builder.

Yard no

1213

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Signal letter/Call sign

XCPM

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

4372

The port in which a vessel is registered or permanently based.

Port of registry

Tampico

The date of first visit by a surveyor.

Date of first survey

22/01/1952

The individual and/or organisation listed

Ship owner

Petroleos Mexicanos

Location where the document is written.

Location of Document Creation

Los Angeles

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Carrying Petroleum in Bulk; Classed 6,53; 2,53 Lan; SS Lan 6,53; LMC 6,53; DBS 3,53; S 1,53 CL

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7884

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Recorded information relating the specific cargo being conveyed.

Cargo

Petroleum in bulk

Physical extent of a record.

Number of parts

3

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.