Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1951
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Fairfield Shipbuilding & Engineering Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Govan, Glasgow
The port in which a vessel is registered or permanently based.
La Guaira
The individual and/or organisation listed
Compania Venezuelan Anonima Venezolana de Navegacion
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Fairfield Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
0000
Name of ship as recorded on the record
Ciudad de Barquisimeto
The process of transferring a vessel to water, but not necessarily her completion.
22/05/1951
Unique identifier for a given ship, it is assigned by a builder.
753
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Fragment
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Glasgow
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
ndated
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.