Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

07/03/1949

The year in which a vessel’s construction is completed.

Year of ship completion

1949

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Kalmar Varv

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Kalmar

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

16561

The listed port to which a given vessel belongs.

Port belonging to

Vastervik

The date of first visit by a surveyor.

Date of first survey

24/02/1948

The individual and/or organisation listed

Ship owner

Rederi A-B Eystrasalt

Location where the document is written.

Location of Document Creation

Gothenburg

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See F E Mchy Rpt

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Motor Vessel

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

601

Location of construction for a vessel’s engines.

Location of engine build

Trollhattan

Engine builder as written

Nydqvist & Holm A-B

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to Vessel Dagny

Name of ship as recorded on the record

Ship name

Fenja

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

25/11/1948

Unique identifier for a given ship, it is assigned by a builder.

Yard no

361

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Got

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4b Report on Oil Engine Machinery

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

23/10/1948

Name of the individual/entity/organisation responsible for authoring the record

Document author

C O Scotting

Location where a vessel’s survey was undertaken.

Location of Survey

Trollhattan

Date of the meeting of the Classing Committee.

Date of Classing committee

29/04/1949

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Heavy Oil Trunk Engine

Date in which construction of a vessel’s engines were completed.

Year of engine build

1948

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.