Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
06/06/1919
The year in which a vessel’s construction is completed.
1919
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Asano Shipbuilding Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
12
A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).
25086
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Yka
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
28/05/1919
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Seisuke Kuchiki
Location where the document is written.
Yokohama
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; A & CP; +LMC 5,19; FD
Recorded information related to a vessel’s movements.
Tsurumi; United Kingdom
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Rozan Maru
The process of transferring a vessel to water, but not necessarily her completion.
01/05/1919
Name of the shipbuilder as it appears on the record.
A Tomiyama
The port or place in which the vessel’s construction took place, at the time of writing.
Tsurumi
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
RMBJ
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2487
The listed port to which a given vessel belongs.
Uraga
The date of first visit by a surveyor.
03/12/1918
The individual and/or organisation listed
Hashimoto Kisen Kaisha
Name of the individual/entity/organisation responsible for authoring the record
James Crichton
Location where a vessel’s survey was undertaken.
Tsurumi
Date of the meeting of the Classing Committee.
15/07/1919
The name of the port/place of destination given.
United Kingdom
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5447
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Also refers to Vessel Choyo Maru
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.