Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
30/08/1902
The year in which a vessel’s construction is completed.
1902
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ailsa Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Troon
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
20202
The listed port to which a given vessel belongs.
Glasgow
The date of first visit by a surveyor.
29/10/1901
The individual and/or organisation listed
John Hay & Sons
Name of the individual/entity/organisation responsible for authoring the record
J W Dimmock
Name of surveyor.
J W Dimmock
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 8,02
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
624
Location of construction for a vessel’s engines.
Glasgow
Muir & Houston Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1902
Name of ship as recorded on the record
The Countess
The process of transferring a vessel to water, but not necessarily her completion.
06/08/1902
Unique identifier for a given ship, it is assigned by a builder.
108
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
30/08/1902
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Peter Morrison
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
15/09/1902
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Compound Screw
Date in which construction of a vessel’s engines were completed.
1902
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1902
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.