Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
17/06/1929
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Deutsche Werft A G Hamburg
The port or place in which the vessel’s construction took place, at the time of writing.
Hamburg
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
18800
The listed port to which a given vessel belongs.
Rouen
The date of first visit by a surveyor.
03/09/1928
The individual and/or organisation listed
Compagnie Nationale de Navigation
Location where the document is written.
Hamburg
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 6,29; CL FD; Fitted for Oil Fuel (6,29); Fp above 150 F
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
9117
Location of construction for a vessel’s engines.
Hamburg
Deutsche Werft A G
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1929
Name of ship as recorded on the record
Vendemiaire
The process of transferring a vessel to water, but not necessarily her completion.
22/04/1929
Unique identifier for a given ship, it is assigned by a builder.
119
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ham
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Steam Reciprocating Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
15/06/1929
Name of the individual/entity/organisation responsible for authoring the record
A H A Carstensen
Location where a vessel’s survey was undertaken.
Hamburg
Date of the meeting of the Classing Committee.
20/08/1929
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
4 Cylinders LENTZ Engine Type 12
Date in which construction of a vessel’s engines were completed.
1929
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1929
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.