Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
14/08/1919
The year in which a vessel’s construction is completed.
1920
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Monmouth Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Chepstow, Monmouthshire
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
4411
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newport 19912
The date of first visit by a surveyor.
10/05/1918
Name of the individual/entity/organisation responsible for authoring the record
A Campbell
Location where a vessel’s survey was undertaken.
Manchester
Date of the meeting of the Classing Committee.
30/07/1920
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
H P & L P Rateau Turbine & DR Gear
Date in which construction of a vessel’s engines were completed.
1919
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1919
Physical extent of a record.
1
Name of ship as recorded on the record
War Illiad
The process of transferring a vessel to water, but not necessarily her completion.
17/07/1920
Unique identifier for a given ship, it is assigned by a builder.
369
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mch
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4a Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
14/08/1919
Location where the document is written.
Manchester
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Minute on Npt 19912
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6551
Location of construction for a vessel’s engines.
Manchester
British Westinghouse Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1919
Pertinent, useful or interesting recorded content.
Also refers to Vessel Sile
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.