Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/11/1901
The year in which a vessel’s construction is completed.
1901
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
W Harkness & Son Ltd
Unique identifier for a given ship, it is assigned by a builder.
156
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
01/11/1901
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
O & W William
Name of the individual/entity/organisation responsible for authoring the record
Octavius Narbeth; A Campbell Holms
Name of surveyor.
A Campbell Holms
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; Lloyds A & CP; +LMC 10,01
Recorded information related to a vessel’s movements.
Middlesbrough; Tyne; Valencia
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1901
Physical extent of a record.
2
Name of ship as recorded on the record
Coranian
The process of transferring a vessel to water, but not necessarily her completion.
11/10/1901
Name of the shipbuilder as it appears on the record.
W Harkess & Son
The port or place in which the vessel’s construction took place, at the time of writing.
Middlesbrough
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3224
The listed port to which a given vessel belongs.
Cardiff
The date of first visit by a surveyor.
10/04/1901
The individual and/or organisation listed
The Steam Ships Goidelian & Coranian Co Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William Evans
Location where the document is written.
Middlesbrough on Tees
Location where a vessel’s survey was undertaken.
Middlesbrough
Date of the meeting of the Classing Committee.
15/11/1901
The name of the port/place of destination given.
Tyne; Valencia
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1223
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1901
Pertinent, useful or interesting recorded content.
Also refers to Vessel Goidelian
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.