Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/08/1932
The year in which a vessel’s construction is completed.
1930
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Deutsche Werft Aktiengesellschaft
The port or place in which the vessel’s construction took place, at the time of writing.
Hamburg
Additional numbers that feature on a given record that may be used for identification.
34223
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Bruun und van der Lippe
Location where the document is written.
Hamburg
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Carrying Petroleum in bulk
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Name of ship as recorded on the record
Kiyo Maru
The process of transferring a vessel to water, but not necessarily her completion.
07/06/1930
Unique identifier for a given ship, it is assigned by a builder.
141
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 Surveys for Freeboard
The port in which a vessel is registered or permanently based.
Tokio
The individual and/or organisation listed
Skibsaktieselskapet Vigrid
Name of the individual/entity/organisation responsible for authoring the record
Th C C Goering
Location where a vessel’s survey was undertaken.
Hamburg
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7356
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.