Date recorded as the time of writing.

Date of document

12/05/1911

The year in which a vessel’s construction is completed.

Year of ship completion

1911

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Smiths Dock Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Middlesbrough on Tees

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

60358

The listed port to which a given vessel belongs.

Port belonging to

Fleetwood

The date of first visit by a surveyor.

Date of first survey

15/03/1911

The individual and/or organisation listed

Ship owner

The New Docks Steam Trawling Co Ltd

Location where the document is written.

Location of Document Creation

Newcastle on Tyne

Location where a vessel’s survey was undertaken.

Location of Survey

North Shields

Date of the meeting of the Classing Committee.

Date of Classing committee

16/06/1911

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

295

Location of construction for a vessel’s engines.

Location of engine build

North Shields

Engine builder as written

Shields Engineering & Dry Dock Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Nancy Hague

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

13/04/1911

Unique identifier for a given ship, it is assigned by a builder.

Yard no

470

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Nwc

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4 Report on Machinery

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

12/05/1911

Name of the individual/entity/organisation responsible for authoring the record

Document author

Charles Cooper

Name of surveyor.

Surveyor

Charles Cooper

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+LMC 5,11

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple

Date in which construction of a vessel’s engines were completed.

Year of engine build

1911

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1