Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

10/03/1913

The year in which a vessel’s construction is completed.

Year of ship completion

1913

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Smiths Dock Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Middlesbrough on Tees

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

63881

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

Middlesbrough 7966

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

10/03/1913

Name of the individual/entity/organisation responsible for authoring the record

Document author

R W Coomber; J Kerr

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle on Tyne

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Sasebo

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

07/05/1913

Unique identifier for a given ship, it is assigned by a builder.

Yard no

547

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Nwc

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

5 Report on Boilers

The listed port to which a given vessel belongs.

Port belonging to

Cardiff

The date of first visit by a surveyor.

Date of first survey

04/10/1912

The individual and/or organisation listed

Ship owner

Neale & West Ltd

Location where the document is written.

Location of Document Creation

Newcastle on Tyne

Date of the meeting of the Classing Committee.

Date of Classing committee

17/06/1913

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.