Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
05/02/1907
The year in which a vessel’s construction is completed.
1907
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan, Hunter & Wigham Richardson Ltd
Unique identifier for a given ship, it is assigned by a builder.
783
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
HKBL
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
52309
The listed port to which a given vessel belongs.
Southampton
The date of first visit by a surveyor.
31/05/1906
The individual and/or organisation listed
Shaw Savill & Albion Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
A Campbell Holms
Name of surveyor.
A Campbell Holms
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; shelter dk with fbd S 5\'2; +LMC 2,07; Elec light; Ref machy; Lloyds A & CP
Broad categories and subdivisions of vessels related to their purpose or function.
Twin Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1907
Physical extent of a record.
2
Name of ship as recorded on the record
Arawa
The process of transferring a vessel to water, but not necessarily her completion.
29/11/1906
Name of the shipbuilder as it appears on the record.
A Claughton
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
02/02/1907
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Burton
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
Newcastle on Tyne
Date of the meeting of the Classing Committee.
08/02/1907
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
9372
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1907
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.