Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
26/06/1917
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Goole Shipbuilding & Repairing Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Goole
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
15/06/1917
Location where the document is written.
Sheffield
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Richardson Westgarth & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1917
Pertinent, useful or interesting recorded content.
Engine Forgings no 2131; Manufactured by Woodhouse & Rixson of Sheffield
Name of ship as recorded on the record
William Chatwood
The process of transferring a vessel to water, but not necessarily her completion.
07/01/1920
Unique identifier for a given ship, it is assigned by a builder.
248
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings
The date of first visit by a surveyor.
12/06/1917
Name of the individual/entity/organisation responsible for authoring the record
J Pringle
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Hartlepool
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1917
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.