Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

05/10/1929

The year in which a vessel’s construction is completed.

Year of ship completion

1929

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Nicolaieff State Shipbuilding Yard Andrea Marti

Unique identifier for a given ship, it is assigned by a builder.

Yard no

185

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Nic

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

1 Steel Steamer or Motorship

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

27/09/1929

Name of the individual/entity/organisation responsible for authoring the record

Document author

F C Cocks

Location where a vessel’s survey was undertaken.

Location of Survey

Nicolaieff

Date of the meeting of the Classing Committee.

Date of Classing committee

25/10/1929

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Recorded information relating the specific cargo being conveyed.

Cargo

Petroleum in bulk

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Title of Document has been Altered

Name of ship as recorded on the record

Ship name

Embaneft

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

07/11/1927

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

Nicolaieff State Ship Building Yard Andrea Marti

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Nicolaieff, U S S R

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

13

The port in which a vessel is registered or permanently based.

Port of registry

Novorissisk

The date of first visit by a surveyor.

Date of first survey

12/10/1926

The individual and/or organisation listed

Ship owner

Naptha Syndicate U S S R

Location where the document is written.

Location of Document Creation

Nicolaieff

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Carrying Petroleum in Bulk; Lloyds A & CP; +LMC 9,29 (Oil Engines) OG; 2 DB 85 lbs

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Twin Screw Motor Vessel

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7792

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Physical extent of a record.

Number of parts

4

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.