Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/09/1939
The year in which a vessel’s construction is completed.
1937
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The Burntisland Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Burntisland
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Newcastle on Tyne
Recorded information related to a vessel’s movements.
London; Newcastle
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1791
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Title of Document has been altered; Also refers to vessel Troutpool
Name of ship as recorded on the record
Corfield
The process of transferring a vessel to water, but not necessarily her completion.
11/06/1937
Unique identifier for a given ship, it is assigned by a builder.
214
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Certificate of Survey of Damage & Repair
Name of the individual/entity/organisation responsible for authoring the record
J F Roberts
The name of the port/place from which a vessel’s voyage originated.
London
The name of the port/place of destination given.
Newcastle
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.