Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/06/1931
The year in which a vessel’s construction is completed.
1931
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Hong Kong & Whampoa Dock Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
691
Abbreviations of the names of ports with Lloyd’s Register survey offices.
H.Kg
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Fittings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
13/06/1931
Name of the individual/entity/organisation responsible for authoring the record
T S Morrison
Location where a vessel’s survey was undertaken.
Hong Kong
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Name of ship as recorded on the record
Manapla
The process of transferring a vessel to water, but not necessarily her completion.
21/05/1931
Name of the shipbuilder as it appears on the record.
R M Dyer
The port or place in which the vessel’s construction took place, at the time of writing.
Hong Kong
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
6712
The listed port to which a given vessel belongs.
Iloilo
The date of first visit by a surveyor.
26/05/1931
The individual and/or organisation listed
The North Negros Sugar Co Inc
Location where the document is written.
Hong Kong
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
257
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.