Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
04/05/1916
The year in which a vessel’s construction is completed.
1916
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Mitsubishi Dockyard & Engine Works
The port or place in which the vessel’s construction took place, at the time of writing.
Nagasaki
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1065
The listed port to which a given vessel belongs.
Tokio
The date of first visit by a surveyor.
19/06/1915
The individual and/or organisation listed
Nippon Yusen Kaisha
Name of the individual/entity/organisation responsible for authoring the record
A S Williamson
Location where a vessel’s survey was undertaken.
Nagasaki
Date of the meeting of the Classing Committee.
27/06/1916
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1916
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1916
Physical extent of a record.
1
Name of ship as recorded on the record
Akita Maru
The process of transferring a vessel to water, but not necessarily her completion.
20/03/1916
Unique identifier for a given ship, it is assigned by a builder.
252
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nag
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
04/05/1916
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
U Tanaka
Location where the document is written.
Nagasaki
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 5,10; FD
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3792
Location of construction for a vessel’s engines.
Nagasaki
Mitsubishi Dockyard & Engine Works
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1916
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.