Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
12/12/1922
The year in which a vessel’s construction is completed.
1922
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
White Bros (Southampton) Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Southampton
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
11412
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
J G MacKillop; G A Drydon Toyne
Location where a vessel’s survey was undertaken.
Southampton
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Date in which construction of a vessel’s engines were completed.
1922
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Ganguil II
The process of transferring a vessel to water, but not necessarily her completion.
25/10/1922
Unique identifier for a given ship, it is assigned by a builder.
221
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sou
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
The individual and/or organisation listed
Spanish Government
Location where the document is written.
Southampton
Date of the meeting of the Classing Committee.
15/12/1922
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Southampton
J I Thornycroft & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.