Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
18/10/1911
The year in which a vessel’s construction is completed.
1911
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong Whitworth & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Walker, Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
61221
The listed port to which a given vessel belongs.
Osaka
The date of first visit by a surveyor.
19/04/1911
The individual and/or organisation listed
The Osaka Shosen Kabushiki Kaisha
Location where the document is written.
Newcastle
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 10,11; FD
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Inverted Triple Expansion
Date in which construction of a vessel’s engines were completed.
1911
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Cho-Sen Maru
The process of transferring a vessel to water, but not necessarily her completion.
11/09/1911
Unique identifier for a given ship, it is assigned by a builder.
839
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
18/10/1911
Name of the individual/entity/organisation responsible for authoring the record
R W Coomber
Location where a vessel’s survey was undertaken.
Newcastle
Date of the meeting of the Classing Committee.
27/10/1911
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2832
Location of construction for a vessel’s engines.
Wallsend
North Eastern Marine Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No