Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
04/01/1945
The year in which a vessel’s construction is completed.
1944
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Lewis & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Aberdeen
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3783
Additional numbers that feature on a given record that may be used for identification.
No 3550; No in Register Book 5527
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
04/01/1945
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
E P Atkinson & Son
Location where the document is written.
Aberdeen
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
BS Asterisk
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Stranded & sunk
Vessel’s place of loss or disposal/last known recorded location.
Goole
Recorded date for the vessel’s loss or disposal.
03/10/1951
Pertinent, useful or interesting recorded content.
This is a British Corporation Document. Vessel has been classed by British Corporation
Name of ship as recorded on the record
Empire Cheyne
The process of transferring a vessel to water, but not necessarily her completion.
17/10/1944
Unique identifier for a given ship, it is assigned by a builder.
182
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Abn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
British Corporation Register of Shipping & Aircraft Report of Hull & Equipment
The port in which a vessel is registered or permanently based.
Aberdeen
The date of first visit by a surveyor.
13/03/1944
The individual and/or organisation listed
M O W T
Name of the individual/entity/organisation responsible for authoring the record
A N Saxter; J L Adam; W H Carslerg
Location where a vessel’s survey was undertaken.
Aberdeen
Date of the meeting of the Classing Committee.
02/05/1945
Physical arrangement of a ship’s masts, sails and rigging.
FA - Fore & Aft
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1051
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded & Sank in Dense Fog & Constructive Total Loss
Vessel’s area of loss or disposal/last known recorded location.
River Ouse
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.