Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/10/1921
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Limhamns Skeppsvarv Aktiebolag
The port or place in which the vessel’s construction took place, at the time of writing.
Limhamn
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
325
The listed port to which a given vessel belongs.
Cardiff
The date of first visit by a surveyor.
15/04/1921
The individual and/or organisation listed
Cory & Blundell
Location where the document is written.
Malmo
Date of the meeting of the Classing Committee.
30/05/1922
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
1921
Name of ship as recorded on the record
Waterway
The process of transferring a vessel to water, but not necessarily her completion.
07/04/1921
Unique identifier for a given ship, it is assigned by a builder.
14
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mmo
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5b Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
08/10/1921
Name of the individual/entity/organisation responsible for authoring the record
G W Jorgensen
Location where a vessel’s survey was undertaken.
Limhamn
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
762
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1