Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
30/03/1948
The year in which a vessel’s construction is completed.
1944
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Seattle Tacoma Shipbuilding Corp
The port or place in which the vessel’s construction took place, at the time of writing.
Tacoma
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2346
The port in which a vessel is registered or permanently based.
London
The date of first visit by a surveyor.
17/09/1947
The individual and/or organisation listed
Blue Star Line Ltd
Location where the document is written.
Mobile Alabama
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
LMC 3,48; TS 9,47; TB (Spt) 525 Ibs
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Milwaukee Wisc U S A
Allis Chalmers Manufacturing Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Nichimen Jitsugyo K K for Breaking up at Mihara
Vessel’s area of loss or disposal/last known recorded location.
Hiroshima
Name of ship as recorded on the record
South Africa Star
The process of transferring a vessel to water, but not necessarily her completion.
22/11/1943
Unique identifier for a given ship, it is assigned by a builder.
49
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mob
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
18/03/1948
Name of the individual/entity/organisation responsible for authoring the record
W F Chapman
Location where a vessel’s survey was undertaken.
Chickasaw
Date of the meeting of the Classing Committee.
07/04/1948
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8015
Date in which construction of a vessel’s engines were completed.
1943
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Mihara
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.