Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1939
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A Hall & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Aberdeen
Additional numbers that feature on a given record that may be used for identification.
V3817
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
John H Nicholson
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
D Rowan & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Towed & Sunk
Recorded date for the vessel’s loss or disposal.
__/02/1965
Pertinent, useful or interesting recorded content.
Engine or Boiler Valves or Connections No V3817; Manufactured by Cockburns Ltd of Glasgow
Name of ship as recorded on the record
Foremost Clan
The process of transferring a vessel to water, but not necessarily her completion.
20/06/1939
Unique identifier for a given ship, it is assigned by a builder.
664
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7a Engine or Boiler Valves or Connections
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Glasgow 61247
The date of first visit by a surveyor.
24/05/1939
Location where the document is written.
Glasgow
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Glasgow
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Scuttled
Vessel’s place of loss or disposal/last known recorded location.
Lagos
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.