Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
06/01/1960
The year in which a vessel’s construction is completed.
1956
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Bodewes Scheepswerven N V
The port or place in which the vessel’s construction took place, at the time of writing.
Martenshoek
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
The individual and/or organisation listed
Holm Shipping Co Ltd
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 6,58; +Lloyd\'s RMC; +LMC 3,56; TS 3,56; OG
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Foundered
15
Recorded date for the vessel’s loss or disposal.
24/11/1959
Name of ship as recorded on the record
Holmglen
The process of transferring a vessel to water, but not necessarily her completion.
19/11/1955
Unique identifier for a given ship, it is assigned by a builder.
415
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
15380
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Holm & Co Ltd
Date of the meeting of the Classing Committee.
05/02/1960
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
485
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Foundered
Vessel’s place of loss or disposal/last known recorded location.
Timaru
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.