Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Camper & Nicolson Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Gosport
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Date of the meeting of the Classing Committee.
10/11/1967
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
ated
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to T W Ward Ltd for Breaking up at Inverkeithing
0000
Name of ship as recorded on the record
Philo
The process of transferring a vessel to water, but not necessarily her completion.
01/11/1921
Unique identifier for a given ship, it is assigned by a builder.
299
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
25 Report of Total Loss, Casualty, Breaking Up, et
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+A1; Oil Tanker FP above 150F; River Thames Service Limiting Port Seawards Sheerness 7,66; SS Dr 4Yrs 7,63; +LMC 7,63; BS M7,66; SP 7,65; TS 7,64 OG
Broad categories and subdivisions of vessels related to their purpose or function.
Tanker
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
338
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Inverkeithing
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.