Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/09/1919
The year in which a vessel’s construction is completed.
1919
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Osbourne, Graham & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
27614
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
07/03/1919
The individual and/or organisation listed
John Hudson & Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
G A Hake
Location where a vessel’s survey was undertaken.
Sunderland
Date of the meeting of the Classing Committee.
26/09/1919
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple
Date in which construction of a vessel’s engines were completed.
1919
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1919
Contextual information related to the reasons of the vessel’s loss or disposal.
Sank in Storm
Vessel’s area of loss or disposal/last known recorded location.
Turkish Black Sea Coast
1919
Pertinent, useful or interesting recorded content.
Also refers to Vessel Hornechurch
Name of ship as recorded on the record
Dagenham
The process of transferring a vessel to water, but not necessarily her completion.
13/03/1919
Unique identifier for a given ship, it is assigned by a builder.
259
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
22/09/1919
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Brown
Location where the document is written.
Sunderland
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 9,19
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2178
Location of construction for a vessel’s engines.
Sunderland
MacColl & Pollock Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Foundered
6
Recorded date for the vessel’s loss or disposal.
29/11/1957
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.