Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
26/11/1952
The year in which a vessel’s construction is completed.
1943
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Burntisland Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Burntisland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
109989
The port in which a vessel is registered or permanently based.
Newcastle
The date of first visit by a surveyor.
25/08/1952
The individual and/or organisation listed
Carlton Steam Ship Co Ltd; Cambay Steam Ship Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
W Rouse; Norman D Rotts
Location where a vessel’s survey was undertaken.
Jarrow
Date of the meeting of the Classing Committee.
30/12/1952
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Glasgow
David Rowan & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
To be broken up
The country or national waters where a vessel is lost/disposed of, or last recorded.
Hong Kong
Physical extent of a record.
4
Name of ship as recorded on the record
Brighton
The process of transferring a vessel to water, but not necessarily her completion.
17/06/1943
Unique identifier for a given ship, it is assigned by a builder.
271
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
20/11/1952
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Chapman & Willan Ltd
Location where the document is written.
Newcastle on Tyne
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 11,52; S 11,52; Fitted oil Fuel 11,52 FP Above 150F
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5221
Date in which construction of a vessel’s engines were completed.
1943
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1952
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up at Hong Kong
1952
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.