Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/03/1929
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan Hunter & Wigham Richardson Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Wallsend on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2242
Additional numbers that feature on a given record that may be used for identification.
No 2224; No in Register Book 3626
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
28/03/1929
Name of the individual/entity/organisation responsible for authoring the record
John Lundgren; James Barr
Location where a vessel’s survey was undertaken.
Newcastle
Date of the meeting of the Classing Committee.
23/12/1929
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Walker
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Hamilton Ontario
Physical extent of a record.
1
Name of ship as recorded on the record
Ralph Gilchrist
The process of transferring a vessel to water, but not necessarily her completion.
__/03/1929
Unique identifier for a given ship, it is assigned by a builder.
1373
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
British Corporation for the Survey & Registry of Shipping Report of Machinery
The port in which a vessel is registered or permanently based.
Newcastle
The date of first visit by a surveyor.
13/09/1928
The individual and/or organisation listed
Sarnia Steamships Ltd
Location where the document is written.
Newcastle
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
MBS Asterisk
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Surface Condensing
Swan Hunter & Wigham Richardson Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up, Demolition Completed
Recorded date for the vessel’s loss or disposal.
__/06/1962
Pertinent, useful or interesting recorded content.
This is a British Corporation Document. Vessel has been classed by British Corporation; Also refers to Vessel E P Murphy
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.