Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/11/1954
The year in which a vessel’s construction is completed.
1946
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
West Coast Shipbuilders Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Vancouver, BC
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
11187
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
17/11/1954
The individual and/or organisation listed
P & O Steam Navigation Co
Location where the document is written.
Bombay
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; 5-54 with Freeboard; S S Syd 12-50; Fitted for Oil Fuel 10-46; FP Above 150 F; +LMC 12-50; BS 1-54; TS CL 5-54
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Montreal
Dominion Engineering Works Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up, Demolition Commenced
Physical extent of a record.
1
Name of ship as recorded on the record
Dongola
The process of transferring a vessel to water, but not necessarily her completion.
12/04/1945
Unique identifier for a given ship, it is assigned by a builder.
153
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bom
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
17/11/1954
Name of the individual/entity/organisation responsible for authoring the record
D C Fletcher
Location where a vessel’s survey was undertaken.
Bombay
Date of the meeting of the Classing Committee.
13/01/1955
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7371
Date in which construction of a vessel’s engines were completed.
1946
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Bombay