Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/03/1960
The year in which a vessel’s construction is completed.
1926
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
George Brown & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
142274
The port in which a vessel is registered or permanently based.
London
The date of first visit by a surveyor.
12/03/1960
The individual and/or organisation listed
Frederick T Everard & Sons Ltd
Location where the document is written.
London
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Oil Tanker 7-29; SS (Dr); +LMC CS 8-57; TS OG 7-59; Oil Eng
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Oil Engines 2 SA 4Cylinders
Date in which construction of a vessel’s engines were completed.
1926
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Canvey Island
Physical extent of a record.
1
Name of ship as recorded on the record
Prowess
The process of transferring a vessel to water, but not necessarily her completion.
10/07/1926
Unique identifier for a given ship, it is assigned by a builder.
154
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Periodical Surveys & Repairs of Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/03/1960
Name of the individual/entity/organisation responsible for authoring the record
K G Kirby
Location where a vessel’s survey was undertaken.
Greenhithe
Date of the meeting of the Classing Committee.
05/04/1960
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
207
Location of construction for a vessel’s engines.
Newbury
Newbury Diesel Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for breaking up
Vessel’s area of loss or disposal/last known recorded location.
Essex
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.