Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

21/02/1953

The year in which a vessel’s construction is completed.

Year of ship completion

1929

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Hall Russell & Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Aberdeen

The port in which a vessel is registered or permanently based.

Port of registry

Aberdeen

The individual and/or organisation listed

Ship owner

West African Fisheries

Name of the individual/entity/organisation responsible for authoring the record

Document author

Wrecks & Salvage Ordinance

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sank in port, raised & Sold for breaking up

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Conducted by President Jack Winston Cooper; Assessors Harry Anderson McGhee & Maurice Alfred Warren; Attendees Thomas Swinburne Leighton, Douglas H E Teesdale, Harry Legge, Donald George Dowling; Witnesses James Flett, Edmond A R Chilton, George W Mawer, Michael Nmeka, William J Anderson, John Farquher

Name of ship as recorded on the record

Ship name

Strathalbyn

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

22/08/1929

Unique identifier for a given ship, it is assigned by a builder.

Yard no

701

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Enquiry

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

James Flett

Location where the document is written.

Location of Document Creation

Lagos

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

To be broken up

Physical extent of a record.

Number of parts

35

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.