Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/03/1937
The year in which a vessel’s construction is completed.
1923
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Furness Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Haverton Hill on Tees
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1394
The port in which a vessel is registered or permanently based.
London
The date of first visit by a surveyor.
14/01/1937
The individual and/or organisation listed
The Admiralty
Location where the document is written.
Malta
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 2,37
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Middlesbrough
Richardsons Westgarth & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up
Name of ship as recorded on the record
Reliant
The process of transferring a vessel to water, but not necessarily her completion.
25/11/1922
Unique identifier for a given ship, it is assigned by a builder.
33
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mlt
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
26/02/1937
Name of the individual/entity/organisation responsible for authoring the record
L J Calcaterra
Location where a vessel’s survey was undertaken.
Malta
Date of the meeting of the Classing Committee.
16/04/1937
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7928
Date in which construction of a vessel’s engines were completed.
1923
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.