Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

08/02/1962

The year in which a vessel’s construction is completed.

Year of ship completion

1917

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Russell & Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Port Glasgow

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

9065

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Middlesbrough 22361

The date of first visit by a surveyor.

Date of first survey

22/01/1962

Name of the individual/entity/organisation responsible for authoring the record

Document author

Edgar Watson

Location where a vessel’s survey was undertaken.

Location of Survey

Kingston

Date of the meeting of the Classing Committee.

Date of Classing committee

23/03/1962

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7684

Engine builder as written

John G Kincaid & Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to Kinoshita & Co for Breaking up at Hirao

Physical extent of a record.

Number of parts

2

Name of ship as recorded on the record

Ship name

Capella

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

16/04/1917

Unique identifier for a given ship, it is assigned by a builder.

Yard no

695

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Kgn

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Periodical Surveys & Repairs of Machinery

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

08/02/1962

Location where the document is written.

Location of Document Creation

Kingston

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Deferred for ES & MBS

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

T 3Cylinder

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

To be broken up

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Hirao

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.