Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/11/1900
The year in which a vessel’s construction is completed.
1900
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Blyth Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Blyth
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
11355
Additional numbers that feature on a given record that may be used for identification.
Newcastle 40912
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
21/11/1900
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
G Fulcher
Location where the document is written.
Hartlepool
Location where a vessel’s survey was undertaken.
West Hartlepool
Date of the meeting of the Classing Committee.
30/11/1900
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1900
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Zelzate
Physical extent of a record.
1
Name of ship as recorded on the record
Woodburn
The process of transferring a vessel to water, but not necessarily her completion.
10/10/1900
Unique identifier for a given ship, it is assigned by a builder.
103
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hpl
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
The listed port to which a given vessel belongs.
Newcastle
The date of first visit by a surveyor.
05/03/1900
The individual and/or organisation listed
Tyne & Blyth Steam Ship Owning Co
Name of the individual/entity/organisation responsible for authoring the record
W J Smith; James C Turpin
Name of surveyor.
W J Smith
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 11,00
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2360
Location of construction for a vessel’s engines.
Hartlepool
John Readhead & Sons Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up, Demolition Commenced
Recorded date for the vessel’s loss or disposal.
18/09/1958
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.