Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/03/1949
The year in which a vessel’s construction is completed.
1948
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Blythswood Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
The port in which a vessel is registered or permanently based.
London
The individual and/or organisation listed
British Tanker Co Ltd
Location where the document is written.
London
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8577
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up
Physical extent of a record.
1
Name of ship as recorded on the record
British Progress
The process of transferring a vessel to water, but not necessarily her completion.
23/08/1948
Unique identifier for a given ship, it is assigned by a builder.
89
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Certificate of Class
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
P E Clement; R Garrett
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.