Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/05/1903
The year in which a vessel’s construction is completed.
1903
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
C S Swan & Hunter Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Wallsend on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
45348
The listed port to which a given vessel belongs.
Dunedin, N. Z.
The date of first visit by a surveyor.
16/10/1902
The individual and/or organisation listed
The Westport Coal Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
G A Hake
Location where a vessel’s survey was undertaken.
Newcastle
Date of the meeting of the Classing Committee.
12/06/1903
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1337
Location of construction for a vessel’s engines.
Newcastle
Wallsend Slipway & Engineering Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Hurley & Dewhurst for Breaking up at Sydney NSW
Physical extent of a record.
1
Name of ship as recorded on the record
Canopus
The process of transferring a vessel to water, but not necessarily her completion.
12/03/1903
Unique identifier for a given ship, it is assigned by a builder.
286
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
22/05/1903
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
G A Lobb
Location where the document is written.
Newcastle
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 5,03; Elec Light
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple
Date in which construction of a vessel’s engines were completed.
1903
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Sydney NSW
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.